Now showing items 1-1 of 1

    • Thumbnail

      Setup Time Reduction for Hot Pressing Mold Changeover 

      Collection: Theses (Master's degree) - Engineering & Management / วิทยานิพนธ์ - การจัดการงานวิศวกรรม
      Type: Thesis
      Ponlapas LERDSAKWANICH; พรลภัส เลิศศักดิ์วานิช; PRACHUAB KLOMJIT; ประจวบ กล่อมจิตร; Silpakorn University. Engineering and Industrial Technology (Silpakorn University, 12/6/2020)
      This research aims to reduce setup time and improve the mold changeover process in Brake pad manufacturer. Each car makes and model has different brake pads. The production has to mold changeover according to their production ...


      Copyright  ©  2026 Silpakorn University Central Library All Rights Reserved.
      Theme by 
      Atmire NV