Recent Submissions

  • Thumbnail

    Labor Productivity Rating in Construction Project in Luangprabang Lao PDR 

    Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
    Type: Independent Study
    Houmvilth MINGBOUBPHA; Houmvilith Mingboubpha; Tayagorn Charuchaimontri; ทยากร จารุชัยมนตรี; Silpakorn University. Architecture (Silpakorn University, 29/11/2019)
    This study aims to determine the Labor Utilization Factor (LUF) and the labor productivity in a construction case study of a police office project in Louangprabang, Lao PDR. Five activities: steel formwork installation for ...
  • Thumbnail

    Testing the use of images and graphics in communication, command and control in construction projects 

    Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
    Type: Independent Study
    Kamonchanok PHONBOONSUEB; กมลชนก ผลบุญสืบ; PIBUL JINAWATN; พิบูลย์ จินาวัฒน์; Silpakorn University. Architecture (Silpakorn University, 2/7/2021)
    The research aimed to study the factors that workers are unable to communicate and coordinate as needed, and to test the use of image and graphics to communicate, command and control in construction projects. The study was ...
  • Thumbnail

    Study of  interior contractor procurement methods for interior decoration of retail stores in shopping center 

    Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
    Type: Thesis
    Prattana SONGWAJA; ปรารถนา ทรงวาจา; PRECHAYA MAHATTANATAWE; ปรีชญา มหัทธนทวี; Silpakorn University. Architecture (Silpakorn University, 29/11/2019)
    The purposes of this study were to compare interior contractor procurement methods for interior decoration of retail stores in shopping centers in terms of operating procedures, criteria for selection of contractor procurement ...
  • Thumbnail

    A comparative study of a Maintenance bond with the actual repair cost of renovation public buildings 

    Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
    Type: Thesis
    รินรดี อารีราษฎร์ (Silpakorn University, 29/11/2019)
    The objectives of this research were 1) to study the difference between the cost of the maintenance bond and the actual cost for repairing defects within the two year warranty period. 2) to investigate the repair frequency ...
  • Thumbnail

    The Verdict of the Supreme Court Related to Construction Contracts  

    Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
    Type: Thesis
    Dararat SEESUWAN; ดารารัตน์ ศรีสุวรรณ์; PIBUL JINAWATN; พิบูลย์ จินาวัฒน์; Silpakorn University. Architecture (Silpakorn University, 29/11/2019)
    Construction is a complex work, both work procedures and working methods, consisting of multiple parties. However, if the employer or contractor breaches the contract, causing the dispute to result in a lawsuit. Since all ...

View more


Copyright  ©  2022 Silpakorn University Central Library All Rights Reserved.
Theme by 
Atmire NV