Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้าง
Browse by
Recent Submissions
-
Building maintenance and management, Case study : Apartment for low-income earners
Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้างType: Thesis(Silpakorn University, 18/6/2021)The purposes of this study were to investigate the current building maintenance practices of apartments for low-income earners, costs, problems, and related risks in order to propose better maintenance plans and to develop ... -
Retention Factors of Craftmen in Thai Architectural Construction Organizations
Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้างType: Thesis(Silpakorn University, 18/6/2021)This research aimed to study the retention factors of craftsmen in Thai architectural construction organizations. The scope of study in type of craftsmen consisted of carpenters, plasterers, and sculptors who ... -
Contractor's cash flow in detached house construction project
Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้างType: Thesis(Silpakorn University, 18/6/2021)The cash flow in a construction project represents the financial status of the project and the capital adequacy required for the project. The objectives of this research were to study contractors' cash flow through the ... -
A COMPARATIVE STUDY OF CONVENTIONAL AND MODULAR BATHROOM CONSTRUCTION IN A HIGH RISE BUILDING
Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้างType: Thesis(Silpakorn University, 10/7/2020)The objective of this study is to compare the construction of a bathroom in high-rise building between the conventional and prefabricated bathroom systems through a case study. Hotel and serviced apartment building on Lang ... -
RISK ANALYSIS IN HOUSING PROJECT WITH ADJUSTABLE DESIGN
Collection: Theses (Master's degree) - Construction Project Management / วิทยานิพนธ์ - การจัดการโครงการก่อสร้างType: Thesis(Silpakorn University, 10/7/2020)The objective of this study is to identify the risk event in a case study of a property developer company which develops housing project with adjustable design. The results are used in the risk assessment process in order ...